ENGR 101 assignment on volume

Sandra just emailed us that ENGR 101 students have a new assignment: “Amongst other things the students are being asked to calculate the volume of the Rutherford Building; and the volume of water passing under the bridge outside the Student union building – in one day.”

This is similar to an assignment last year – see the post I made about the information we had then.

Deborah

Leave a Reply

Your email address will not be published. Required fields are marked *