As part of the reconstruction of the old Bindery area on Level 1, a large area of concrete is going to be cut and removed.
The work is going to be carried out on this Saturday (16 May), between 7.30am and 11am. It will result in significant noise in the South-east area of Level 2 in particular (adjacent to the Copy Centre), but it will also probably go throughout the entire building.
Philip