Central Library – progress with stock moves

The Crown staff have completed moving the stock which was barcoded and ready. TR-Z has moved from Level 2 to level 4. Casual staff are moving stock from level 2 to the warehouse and are then moving the remaining stock back to fill the gaps. Shelving between the lifts will start to be dismantled towards the end of the week.
Joan Simpson

Leave a Reply

Your email address will not be published. Required fields are marked *