Level 2 of the Central has been packed up so that the siesmic joints can be repaired, the ceiling tiles replaced and eventually the new carpet installed. You will also see that they are injecting the cracks in the stairwell walls.
I look foward to the return of Level 2 to the 21 February layout.
Joan Simpson