The scaffolding has been removed from the stairwells from 11 down therefore we are able to access these floors. They will not be open to the students for a couple of weeks as contractors are still working on these floors. This morning the high demand material was collected from these floors and this afternoon the first pull list will be collected and processing during the evening shift.
Range A – GN.
Joan Simpson