Power Outage – John Britten

The electrical supply to John Britten is being upgraded as part of the CETF project, necessitating the building be run off a 5000KVA generator for the week commencing Monday 30 May.

On Saturday 4 June the generator will be disconnected and the building will be reconnected to mains power requiring a power outage between 8.00am and 4.00pm on that day.Please do not enter John Britten on Saturday 4 June 2016.

While the timing has been scheduled for minimum impacts, we apologise in advance for any inconvenience.