Category Archives: Uncategorized

Roadworks Update 6 – Intersection Opening, Maidstone Road One-way Traffic

Dormer Construction are expecting to reopen the Ilam/Creyke/ Maidstone Roads intersection and re-instate two-way traffic on Creyke Road by Thursday 10 July.

Wastewater Upgrade works will then progress along Maidstone Road between Ilam Road and Waimairi Road with a one-way west traffic system in place in this works area until mid-2026.

Key Traffic impacts

  • One-way traffic on Maidstone Road – travelling west direction only. This one-way traffic diversion will be in place until mid-2026.
  • There will be no entry to Maidstone Road from Waimairi Road. Signposted detours will be in place for affected traffic travelling east.
  • A 30km/h speed limit will be in place. This is for worker safety during the works.
  • Traffic management currently in place will be removed: Ilam Road will reopen at the intersection of Creyke/Ilam/Maidstone roads, and on Creyke Road two-way traffic will be reinstated.

Other key information

  • Detours will be signposted for eastbound traffic.
  • Water services and power will be maintained.
  • Any changes to bus routes will be signposted. For information on bus routes, visit www.metroinfo.co.nz.
  • On-street parking will be temporarily removed in Maidstone between Ilam Road and Waimairi Road.
  • UC have parking available on the Dovedale site for staff and students – usual parking charges apply.

For more information or project updates visit www.ccc.govt.nz/ilam-wastewater

Dormer Construction appreciate your continued patience throughout the works period and will be working hard to reduce the impact as much as possible.

Facilities Management

Infrared Sauna Now Open at UC Rec Centre

Infrared Sauna Now Open at UC RecCentre

UC Rec Centre Infrared Sauna

We are excited to announce the launch of our infrared sauna, now available exclusively for UC RecCentre members!

Our infrared sauna uses advanced technology to deliver deep, soothing heat that reaches into your muscles, promoting relaxation and recovery, better sleep, enhanced mental well-being, and overall health.

Whether you are winding down after a workout or simply seeking an escape from the stressors of your day, this is the perfect way to recharge. Each session is completely private – no walk-ins allowed, so your time slot is entirely yours.

Booking and Session Info

Book your sauna session today and feel the difference! You can book easily through our app or at Reception.

  • Cost: $10 per session
  • Capacity: Enjoy a private sauna experience or bring up to two people (maximum three people per session)
  • Duration: 45 minutes
  • Session Times:
    • On the hour from 7:00am to 4:00pm
    • On the half-hour from 4:30pm to 8:30pm

 

This is a fantastic new wellness offering that adds even more value to your gym experience!

Want to learn more? Visit our website for full details. Not a member yet? UC students get free access – join today!

 

Ngā mihi,

UC Rec&Sport

 

Building Floor Plan Verification Inspections 1-4 July

The Facilities Management Senior Building Surveyor will be completing Building Floor Plan Verification Inspections on the Fine Arts Buildings (FA01-FA03) and the Forestry Laboratory Block (FO01) between Tuesday 1 July and Friday 4 July.

The purpose of the building floor plan verification is to complete a visual inspection of all rooms in a building to record any differences to the floor plans that the University currently have on file. To do this the Building Surveyor will be accessing all spaces within an area, so please allow access – he will be very quiet!

Please direct any enquiries to FMassist@canterbury.ac.nz

Thank you for your support during the building plan verification inspection programme.

Facilities Management