Facilities Management (FM) advise that there will be a total temporary total electrical outage affecting all Te Ao Mārama Buildings and the McMillan Brown Library between 7am and 8am this Saturday, 2 August, to enable the installation of switchboard monitoring devices into the main electrical switchboard for the Te Ao Mārama buildings (refer to inset or attached map).
In order for this work to be undertaken safely the switchboard will be electrically isolated. And a complete power outage will be in effect for approximately one (1) hour.
- FO04 – Te Ao Mārama, Block A
- FO05 – Macmillan Brown Library
- FO06- Te Ao Mārama, Block C
Please turn off all computer and other electrical prior to the power outage (Friday evening, 1 August 2025)
If you do need to be in these buildings during this time, please dress for the weather or find alternative locations on Campus to work or study.
Thank you for your understanding as we complete these required electrical tasks.
Facilities Management