Facilities Management advises that Contractors will be deconstructing the Scaffold, currently in place on the Engineering & Physical Sciences Library Foyer (EN08), between Monday 26 January and Friday 30 January.
Please note the following key works information and instructions:
- The library will remain open during normal operating hours, and scaffold removal will not impact the entrance to the library.
- The truck for carrying the removed scaffold will be placed to the right-hand side of the library (as you look at the entrance).
- Ensure that you follow all contractor instructions and signage and be aware of contractor vehicles moving around the site and parking inside bollard areas.
Direct all enquiries to FMassist@canterbury.ac.nz
Thank you for your cooperation in ensuring safety during these works.
Facilities Management
