Timber Bridge Access Closed Monday 1 September

Facilities Management advises that following a recent condition assessment of the timber bridge between the Health Centre and University Drive, the decision has been made to close the bridge for health and safety reasons.

The timber bridge will be closed from 1 September 2025. 

Access remains available via the adjacent main bridge.

Affected Area:

  • Pedestrian Bridge between Health Centre and University Drive

What do you need to do?

  • Be aware of increased movements across the main bridge.
  • Do not access the closed off bridge.
  • Adhere to any signage in place.

Please refer any enquiries to fmassist@canterbury.ac.nz

Thank you for your consideration during this closure.

Temporary Access Interruptions – Link-way between Ernest Rutherford and Beatrice Tinsley – Thursday 28 August

Facilities Management Contractors will be carrying out planned quarterly testing of the 3 Automatic fire doors on levels 2,3, and 4, in the link-way between Ernest Rutherford and Beatrice Tinsley, between 7.30am and 12 midday tomorrow Thursday 28 August.

There is one door on each floor and Contractors will be working on one door, one floor, at a time.

The Contractor will manage access as required to allow people to pass through the location, but there may be a small window of time that you will be required to take an alternative route. The stairs and lift will still be operable.

Please follow contractor direction and signage, and if access is temporarily closed use either the lift or stairs.

Please direct any enquiries to fmassist@canterbury.ac.nz

Thank you for your support as these planned fire compliance inspections are undertaken.

Facilities Management

Building Plan Verification and Building Schedule for 25 August – 5 September

The Facilities Management Surveyors will be completing Building Floor Plan Verification Inspections and Building Condition Assessment between 7am-6pm Monday 25 August to Friday 5th September in the following buildings:

  • AR03 – Karl Popper
  • FA01 – FA07 Fine Arts
  • EN18 – Civil – Mechanical
  • EN01 – Rāta
  • AR12 – Psychology and Sociology Laboratory
  • SC24 – Ernest Rutherford
  • SC07 – Beatrice Tinsley
  • SC08 – Julius von Haast
The floor plan verification involves a visual check of room layouts to confirm accuracy with existing plans.

The building survey involves the assessment of building interiors (when vacant) and exteriors. Surveyors may be seen on rooftops and will follow all safety protocols.
Photos may be taken, but individuals will not be identifiable.
To complete these assessments the Building Surveyors will be accessing all spaces within an area or building, so please allow access – they will be very quiet!

Please direct any enquiries to FMassist@canterbury.ac.nz

Please direct any enquiries to FMassist@canterbury.ac.nz

Thank you for your support during the building plan verification inspection programme.

Facilities Management